Project: 48 Inch Gas Pipe Line Naftkhane - Baghdad

 

Description:

IRAQ Ministry of Electricity and IRAQ Ministry of Oil have intended to perform a new gas pipe line from NAFTKHANEH in near to border of IRAN to Baghdad with about 116 Km length 48″ pipeline as the main route including three main branches considered:

 AL-MANSOURIA branch with about 43 Km length 32″ pipeline.

  AL-QUDS Receiver Trap stations branch with about 30 Km length 32″ pipeline.

 AL-SADR branch with about 9 Km length 32″ pipeline.

8 Line Break Valve (LBV), Launcher/Receiver (L/R) Stations are in the main route, 7 LBV and Launcher/Receiver (L/R) Stations are in three branches. 1 central control room (CCR) is in the Baghdad.

 

Activities

 Civil and Mechanical implementation for AL-QUDS branch with about 30 Km length 32″ pipeline(include: excavation, Pipe Line, Welding, Tests, Boring, CCW, Geotextile, Backfill .

all implementation about Civil and Mechanical for LBV Stations and Interconnections for AL-QUDS and AL-SADR branches

Gallery

Project specifications

 

Client: Iraq Oil Ministry (OPC)

Start Date: 2015

Progress: %100